Hidden treasure of the mine, LUCE finds it!
Sustainable mineral resource
development project with LUCE
99.999% ultra-high purity gold,
produced using LUCE's patented technology.
LUCE, the only ultra-luxury silver town
corporation in Korea, is creating it.
Welcome
Thank you for visiting the LUCE Co., Ltd. website.
We are a professional mining development company with extensive experience and
expertise in gold mining. We possess proprietary exploration technology and hold
domestic patents for refining technology.
We operate several gold mines with development and mining rights acquired through
advanced exploration using cutting-edge technology. We plan to further develop
commercially viable gold mines through ongoing explorationDue to the recent surge in international raw material and gold prices, the need for resource development has significantly increased, both domestically and internationally.
We are developing gold mines in La Paz, Bolivia and Laos, and will soon begin full-scale commercial production.
We are also actively working to realize shareholder value and employee welfare by
establishing a transparent and rational management system.
LUCE promises to do its best to grow alongside the local community through continuous
social contribution activities, fostering mutual happiness and establishing itself as a
trustworthy company
We kindly ask for your continued support and interest
Thank you
Luce Co.,Ltd
HAN JAEYOUNG
December 21, 2009
350 million won
gold, silver and other non-ferrous metals mining
Check the location of each mine.
Mt.52-1, Buwon-dong, Sangju-si, Gyeongsangbuk-do
(Cheonbong 1 Mine)
Gold [Au] / Silver [Ag]
79103 (Sangju no.53)
276ha(current drilling 2~4ha)
113,920ton Increased reserves after further investigation
Economic feasibility study: 395 billion won (Based on the current drilling results in 2024)
Unestimated gold, silver production "sure" based on additional drilling results
It removes harmful substances from mineral waste and sells them as construction materials and
ceramic raw materials to minimize the cost of mining.
Generate additional revenue by recycling waste ore (gangue) generated
after mining into construction materials
Additional revenue expected through production of construction
materials using waste ore (gangue)
* daily aggregate production : 130㎥(350 ton)
* aggregate price : 15,000 won /㎥(As of December 2023)
Practical training for university students
at resource-related universities
Short-term programs for
resource practitioners
On-the-job training for domestic and
foreign resource experts
LUCE's current business site of Cheonbong Mine 13,884,360㎡
Check out LUCE's diverse resources including aerial photos, drilling sites, core photos, and electrical resistivity reports.